VNR Group is focused on infrastructure development projects in the growing sectors of Railways, Irrigation, Aviation, Logistics and Power with specialization in Railway infrastructure for the past since 3 decades.

Call us on +91 - 40 - 3516 6988

103, Lake Shore Towers, Raj Bhavan Road, Somajiguda, Hyderabad

Mon - Sat 8 AM - 8 PM

Top

History

1984
Incorporation of M/s V Narayana Reddy
1987
Gauge Conversion
1987
Panel Interlocking
1990
Route Relay Interlocking
1994
Track Linking & Laying
1994
Rail Bridge work
1998
Automatic Signalling - DC Track Circuit
1998
Replacement of Multi Aspect Upper Quadrant with Multi Aspect Colour Light Signals
2001
Automatic Signalling - Audio Frequency Track Circuit
2002
Optic Fibre laying work
2003
Outdoor work with SSI
2005
Block Proving work with Digital Axel Counter
2005
Public Limited Company (VNR Infrastructures Limited)
2006
Turnkey Project Track doubling work
2006
Irrigation work
2006
Intermediate Block Signaling
2008
Aviation project development of runway
2009
Subsidiary Company (VNR Rail Infrastructure Pvt. Ltd)
2009
Electronic Interlocking (Hot Stand By & Warm Stand by)
2009
Civil Engineering Works Minor & Major Bridges
2009
Route Relay Interlocking (RRI) & Data Loggers
2010
Audio Frequency Track Circuit (AFTC), Point Machines Installation
2011
Engineering Earth Works
2014
Construction of Sub - Structure & Super Structure Bridges
2015
Over Head Electrification Works (OHE)
2016
Railway Siding Works
2017
Rehabilitation of Protection of North Guide Bund (Country side), Doubling Works, Sheds & Multi Section Digital Axle Counters (MS-DAC)
Rehabilitation of Protection of North Guide Bund (Country side), Doubling Works, Sheds & Multi Section Digital Axle Counters (MS-DAC)
2017
Railway Siding Works
2016
Over Head Electrification Works (OHE)
2015
Construction of Sub - Structure & Super Structure Bridges
2014
Engineering Earth Works
2011
Audio Frequency Track Circuit (AFTC), Point Machines Installation
2010
Route Relay Interlocking (RRI) & Data Loggers
2009
Civil Engineering Works Minor & Major Bridges
2009
Electronic Interlocking (Hot Stand By & Warm Stand by)
2009
Subsidiary Company (VNR Rail Infrastructure Pvt. Ltd)
2009
Aviation project development of runway
2008
Intermediate Block Signaling
2006
Irrigation work
2006
Turnkey Project Track doubling work
2005
Public Limited Company (VNR Infrastructures Limited)
2005
Block Proving work with Digital Axel Counter
2005
Outdoor work with SSI
2003
Optic Fibre laying work
2002
Automatic Signalling - Audio Frequency Track Circuit
2001
Replacement of Multi Aspect Upper Quadrant with Multi Aspect Colour Light Signals
1998
Automatic Signalling - DC Track Circuit
1998
Rail Bridge work
1994
Track Linking & Laying
1994
Route Relay Interlocking
1990
Panel Interlocking
1987
Gauge Conversion
1987
Incorporation of M/s V Narayana Reddy
1984